Completed white-clad industrial building for a food production company at Pinnacles Industrial Estate, Harlow, refurbished by UDM

Commercial Project — Completed May 2026

Food Production Company, Harlow

UDM transformed the exterior of an existing industrial building for a food production company at Pinnacles Industrial Estate, Harlow — delivering a modern, clean and durable building envelope to improve performance, appearance and long-term protection.

The Journey

From Existing to Exceptional

A step-by-step look at how we transformed this building for our client, from initial condition through to completion.

  1. Initial Condition — From Existing to Exceptional, food production company, Harlow
    01

    Initial Condition

    April 2026

    Existing building prior to works commencing.

  2. Preparation — From Existing to Exceptional, food production company, Harlow
    02

    Preparation

    April 2026

    Existing façade prepared for new cladding installation.

  3. Cladding Installation — From Existing to Exceptional, food production company, Harlow
    03

    Cladding Installation

    April 2026

    New external cladding installed, transforming the building's appearance and performance.

  4. Progress — From Existing to Exceptional, food production company, Harlow
    04

    Progress

    May 2026

    Windows and detailing installed to complete the façade.

  5. Near Completion — From Existing to Exceptional, food production company, Harlow
    05

    Near Completion

    May 2026

    Final areas completed with all cladding, windows and finishes in place.

  6. Completed — From Existing to Exceptional, food production company, Harlow
    06

    Completed

    May 2026

    A modern, clean and durable building envelope, ready for the client's continued operations.

Commercial Project

Roof Refurbishment

Alongside the façade works, UDM carried out a flat roof deck replacement and waterproofing system to the existing building. The works formed part of a wider refurbishment to improve the building's performance, appearance and long-term protection — quality from the ground up.

New plywood roof decking being installed during the flat roof refurbishment in Harlow by UDM

The Journey

Roof Refurbishment — Step by Step

A look at how we completed the roof refurbishment, from preparation through to the finished waterproofing system, providing a durable, long-lasting solution for our client.

  1. Deck Preparation — Roof Refurbishment — Step by Step, food production company, Harlow
    01

    Deck Preparation

    April 2026

    New plywood decking installed over the existing roof structure, providing a strong and even substrate for the waterproofing system.

  2. Deck Installation — Roof Refurbishment — Step by Step, food production company, Harlow
    02

    Deck Installation

    April 2026

    Decking continued across the full roof area, with tapered edges and detailing to perimeter areas.

  3. Detail Work — Roof Refurbishment — Step by Step, food production company, Harlow
    03

    Detail Work

    April 2026

    Existing details prepared and new plywood fitted to areas including upstands and penetrations.

  4. Waterproofing — Roof Refurbishment — Step by Step, food production company, Harlow
    04

    Waterproofing

    May 2026

    High-performance waterproofing system installed to the full roof area, ensuring a durable, weatherproof finish.

  5. Completed Roof — Roof Refurbishment — Step by Step, food production company, Harlow
    05

    Completed Roof

    May 2026

    A clean, professional finish providing long-term protection for the building and its operations.

The Result

A Safer, Stronger Building for the Future

  • Improved protection against the elements
  • High-quality workmanship throughout
  • Minimal disruption to the client's operations
“UDM delivered a professional and efficient service, keeping disruption to a minimum while carrying out the works. The finished roof has transformed the building and gives us long-term confidence.”
Client
Food Production Company, Pinnacles Industrial Estate, Harlow
Improved protection
High-quality workmanship
Minimal disruption

Project at a Glance

Client

Food production company

Location

Pinnacles Industrial Estate, Harlow, Essex

Project Dates

April 2026 – May 2026

Scope of Works

External cladding, windows and associated façade works, plus flat roof deck replacement and waterproofing

Have a Similar Project in Mind?

Talk to UDM about your requirements today.

CallWhatsAppGet Quote