
Commercial Project — Completed May 2026
Food Production Company, Harlow
UDM transformed the exterior of an existing industrial building for a food production company at Pinnacles Industrial Estate, Harlow — delivering a modern, clean and durable building envelope to improve performance, appearance and long-term protection.
The Journey
From Existing to Exceptional
A step-by-step look at how we transformed this building for our client, from initial condition through to completion.
01Initial Condition
April 2026
Existing building prior to works commencing.
02Preparation
April 2026
Existing façade prepared for new cladding installation.
03Cladding Installation
April 2026
New external cladding installed, transforming the building's appearance and performance.
04Progress
May 2026
Windows and detailing installed to complete the façade.
05Near Completion
May 2026
Final areas completed with all cladding, windows and finishes in place.
06Completed
May 2026
A modern, clean and durable building envelope, ready for the client's continued operations.
Commercial Project
Roof Refurbishment
Alongside the façade works, UDM carried out a flat roof deck replacement and waterproofing system to the existing building. The works formed part of a wider refurbishment to improve the building's performance, appearance and long-term protection — quality from the ground up.

The Journey
Roof Refurbishment — Step by Step
A look at how we completed the roof refurbishment, from preparation through to the finished waterproofing system, providing a durable, long-lasting solution for our client.
01Deck Preparation
April 2026
New plywood decking installed over the existing roof structure, providing a strong and even substrate for the waterproofing system.
02Deck Installation
April 2026
Decking continued across the full roof area, with tapered edges and detailing to perimeter areas.
03Detail Work
April 2026
Existing details prepared and new plywood fitted to areas including upstands and penetrations.
04Waterproofing
May 2026
High-performance waterproofing system installed to the full roof area, ensuring a durable, weatherproof finish.
05Completed Roof
May 2026
A clean, professional finish providing long-term protection for the building and its operations.
The Result
A Safer, Stronger Building for the Future
- Improved protection against the elements
- High-quality workmanship throughout
- Minimal disruption to the client's operations
“UDM delivered a professional and efficient service, keeping disruption to a minimum while carrying out the works. The finished roof has transformed the building and gives us long-term confidence.”
Food Production Company, Pinnacles Industrial Estate, Harlow
Project at a Glance
Client
Food production company
Location
Pinnacles Industrial Estate, Harlow, Essex
Project Dates
April 2026 – May 2026
Scope of Works
External cladding, windows and associated façade works, plus flat roof deck replacement and waterproofing
Have a Similar Project in Mind?
Talk to UDM about your requirements today.
